bRisSy.
wHat A boRing PlaCe.
Baiduri House..
Date : Thursday, February 28, 2008
Hmm.. Too bored at home.. hehe.. so shall update abt baiduri.. hehe.. let’s start frm the very beginning..
The time when we started packing n moving out of the old baiduri.. =
This was the old baiduri.. the house I stayed in since I was a baby.. hehe..
My room..
(the things u see in the pic.. isn’t mine.. hehe.. )
April 07..
Starting to take out all the plants etc..
May 07..
030507.. Time to tear down the house..
040507.. Jus 1 day later.. no more house standing.. 0_0
100507.. clearing the metals left frm our old house.. (can sell or something.. )
June 07..
300607… Starting to build our house le..
July 07..
280707..
August 07..
1st floor done.. gng to 2nd floor..
September 07..
280907.. 2 mths later n poof.. 2 lvls up.. hehe
October 07..
201007.. they dng my rm wall le.. (3rd floor)
251007.. u could see the rough layout of the house le..
November 07..
Starting to put the roof..
December 07..
011207.. My rm.. there’s 2 stupid pipe sticking out.. twit eh.. dunno hw to hide it in the wall or something.. gd thing my wardrobe there..
011207.. I cant seem to figure out which floor is this.. hahaha.. but I think its the game rm looking at the corridor.. hehehe..
081207..
The house frm outside..
starting to plaster the walls.. dunno which rm agn.. haha..
Roof up..
Mama’s rm..
Walking down frm lvl 2.. to living rm (1st flr)..
Cross the “bridge”… hahhaa..
Making the wall smooooth.. hehe..
January 08..
050108..
Outside.. still looks the same.. hehe.. they working on the inside..
Ooo..
Instruction for my rm toilet.. hehe..
So far so gd.. =D
Me n my toilet.. hhaha..
View frm my rm.. =
Lets go to the games rm..
Instructions for games rm toilet..
Games rm toilet..
Papa inspecting the house.. hehe..
060108..
Main door.. trying to keep it the same as our fav house.. 52 Lorj.. (miss tt house.. this house better have the same feeling as tt one.. hehe..)
Flr n walls all smooth smooth.. hehe..
Mama’s rm.. (laying out tiles for the toilet..)
WAH.. many many cables.. wonder they noe wat’s for wat or not.. hehe..
Flr done n ready to put parquet.. so gotta protect it 1st..
Toilet.. designed by me.. hehe.. which gave them headache.. haha..
Me n my games rm toilet.. hehe..
110108..
This should be where the letterbox will be..
Main door.. frm inside.. looks familiar??? Hehe..
Parents’ rm toilet..
Games rm..
Games rm window frames are gng up le!!
Starting to do tt line le..
Closer look at the colours of the mosaic..
My room toilet.. designed by me too.. hehe..
Closer look at mosaic..
220108.. last look b4 I return to brissy.. =(
Entrance..
Slow ah.. 1 line oso cant do b4 I go.. but at least the base for the basin done..
Same goes for this..
View frm Games rm..
Downstairs toilet done.. hehe..
230108.. wah lao.. cannot do on 22 meh.. then I can see the awning up.. haiyo..
End of mth.. then tt line done..
February 08..
Starting to do the Kitchen flr..
My rm parquet started..
Corridor too.. ooo..
My rm ceiling done..
Started to fit the things in the toilet le..
Okie dokies.. tt’s all folks.. hmm… the nx update would be when my mum send me more pics.. or when I see it with my own eyes.. my new home.. haha..
Baby,top.
|| 12:10 AM
Profile
/Picture>
SheRiLyn LeE
10-14 nov melbourne
15-17 nov GC (Maybe)
8 dec screening
12-21 dec parents coming 23 dec HOME!!
Sheri
||
Me
.
talk talk
Links
啦啦世界
4EB FM (stream our program)
every Sunday 8-9pm SG time
M
emories
July 2007
August 2007
September 2007
October 2007
November 2007
December 2007
January 2008
February 2008
March 2008
April 2008
May 2008
June 2008
July 2008
August 2008
September 2008
October 2008
November 2008
January 2009
February 2009
March 2009
April 2009
May 2009
July 2009
August 2009
September 2009
October 2009
November 2009
December 2009
">
Credits
Do not remove. :)
Layout by :
N-serendipity.
Icons by :
Black-balloonxx.
Floral Patterns :
Blue_mutzz.